Moving a donga or portable building: a simple checklist
Dongas, site sheds, cabins and other portable buildings are designed to be moved, but a move still takes some planning. Whether it's worker accommodation going onto a farm near Gatton, a site office heading to a Brisbane build or a cabin moving onto acreage near Toowoomba, the same checklist applies. Work through these steps before moving day and the job will go much more smoothly.
1. Measure the building
Measure the length, width and height of the building, including anything that sticks out like an awning, a step, an air-conditioning unit or a verandah. Note what it's built from and whether it sits on skids. If you have paperwork from the manufacturer that lists its weight, keep it handy — weight is one of the first things we'll ask about.
Take a few photos of the building from each side, plus the skids or base it sits on. Photos help us check how it will load and spot anything that might need extra care on the trip.
2. Check access at both ends
A portable building is often wider and taller than a shipping container, so access matters even more. Check both the pickup site and the drop-off site.
- Gates, fences and driveways wide enough for the truck and the building
- Power lines, phone lines, gutters and tree branches overhead
- Tight turns, steep slopes and soft or wet ground
- Enough clear space around the final position for the truck to manoeuvre
3. Disconnect services
Any power, water, sewer or gas connected to the building must be disconnected before the truck arrives. This needs to be done by a licensed electrician or plumber, not by the driver. Make sure cables and pipes are clear of the building so nothing catches as it's lifted or slid onto the tray.
If the building is tied down or bolted to footings, have those fixings removed too.
4. Empty and secure the inside
It's best to empty a donga completely before it moves. Anything left inside can slide around, break windows or damage walls during the trip. If some fixed furniture has to stay, make sure it's secured.
- Remove loose furniture, appliances and boxes
- Take down anything hanging on walls
- Close and latch all windows and doors, and lock them if possible
- Tape cupboard doors shut
- Remove or secure air-conditioning units and external fittings that could work loose
5. Prepare the new site
The drop-off site needs a prepared, level base ready before the building arrives, whether that's stumps, a slab, compacted road base or sleepers. Mark the exact position and which way the door should face. Like containers, a portable building comes off the tray in the direction the truck is facing.
Portable buildings used as dwellings, offices or sheds may need council approval depending on where they go and how they'll be used. Check with your local council before the move.
6. Book the move
When you call or send the quote form, have these details ready so we can check the job suits our truck and give you a price before we head out.
- Building size and weight if known
- Pickup and drop-off addresses
- Photos of the building and both sites
- Any access limits or time restrictions
- Confirmation that services will be disconnected
On moving day
Be on site at both ends if you can, or have someone there who knows exactly where the building should go. Keep people and animals clear of the truck while it's loading and unloading. Once the building is in place, check that it's sitting level on its base before the truck leaves, then arrange for your electrician and plumber to reconnect services.
Ready to move a donga, site shed or cabin around the Lockyer Valley, Toowoomba, Ipswich or Brisbane? Call us on 0434 810 090 or send the quote form.
Need a hand?
We answer 24/7. Call or SMS and we'll give you a price before we send the truck.
